VoIP Part 1 (Work Breakdown Structure)

   

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

This      assignment contains two (2) deliverables: a summary document to be      delivered in a word processor document format and a Work Breakdown      Structure (WBS) to be delivered in a project file.

     Overview
     As the project manager for an IT department, you have been assigned to      manage the project of deploying a new VoIP phone system to the company’s      campus. The campus consists of three (3) different buildings, each with      twenty to fifty (20 to 50) workstations. The project must be completed in      ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)
1.     Write a one to two (1-2) page summary document in which you:
a.    Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
b.    Define a work breakdown structure and describe the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
2.    Use Microsoft Project to create a WBS which:
a.    Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
b.    Contains at least sixty (60) line items distributed in ten (10) or more work packages.
c.    Contains Work Breakdown Structure Code for each task.
d.    Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
 

Be       typed, double spaced, using Times New Roman font (size 12), with one-inch       margins on all sides; citations and references must follow APA or       school-specific format. Check with your professor for any additional       instructions.
Include       a cover page containing the title of the assignment, the student’s name,       the professor’s name, the course title, and the date. The cover page and       the reference page are not included in the required assignment page       length.

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper
Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our Guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 30% with the discount code 30-OFF