Project Title
Environment And Present Working System
Aims/Objectives Of The Project
Investors
Advantages Of The Project
Development Team
Results To Be Expected
Work Breakdown Structure
Milestones
Management Of Risks
Quality criteria
Cost estimation
Conclusion
References
A proper network infrastructure is extremely significant due to it being highly reliable as well as tough. The pharmaceutical company has decided to upgrade/modify its present network foundation. As a result of which, there is a need of up gradation of the network structure which will be done by changing the present hardware, new workstations, networks and services. This needs to be done in such a way that it supports both the existing demands and out future expansion plans of the company. In agreement, the plan for the project has been enclosed. It includes all details of the network structure, including the criteria’s of success that is required for the achievement of goals. As an add-on, the plan has been devised in such a way that no disruption of the present network is done while the upgrading of the network is taking place. So, the collaboration has to be done with a set of company resources, which have done work on such projects. While the upgrading is taking place, one important fact should be taken care of – there should be minimum investment from company’s side while the returns should be at a maximum level.
The main goals of the project are as follows-
The interested parties of the project are-
Some of the key benefits that the project will enjoy are –
Industrial team
Nonindustrial team
Preliminary Approximation Of Costs
WBS |
Task Name |
1 |
Network Upgrade |
1.1 |
Plan |
1.1.1 |
Prepare project plan |
1.1.1.1 |
Analyze requirements |
1.1.1.2 |
Perform feasibility study |
1.1.1.3 |
Get sign-offs on deliverables |
1.1.2 |
Take backup |
1.1.2.1 |
Identify backup location |
1.1.2.2 |
Perform backup operation |
1.2 |
Analyze & Design |
1.2.1 |
Hardware sizing |
1.2.1.1 |
Market research for best configuration of machines |
1.2.1.2 |
Finalize detailed configuration of network |
1.2.1.3 |
Prepare bill |
1.2.1.4 |
Sign-off |
1.2.2 |
Finalize new furniture |
1.2.3 |
Purchase furniture |
1.2.4 |
Place furniture |
1.2.5 |
Vendor selection |
1.2.5.1 |
Raise tender for workstation procurement |
1.2.5.2 |
Prepare vendor selection criteria |
1.2.5.3 |
Identify vendor for workstation purchase |
1.2.5.4 |
Configuration & Setup |
1.3 |
Purchase & Store |
1.3.1 |
Perform quality test on selected workstations |
1.3.2 |
Store machines in warehouse |
1.3.3 |
Install |
1.3.3.1 |
Identify locations of machine |
1.3.3.2 |
Install the hardware on the identified machines |
1.3.3.3 |
Identify and install network server |
1.3.3.4 |
Locate router |
1.3.3.5 |
Connect machines |
1.3.3.6 |
Configure workstations for internet connectivity |
1.3.3.7 |
Update software on machines |
1.3.3.8 |
Test software updates |
1.4 |
Testing |
1.4.1 |
Test each machine |
1.4.2 |
Get signoffs |
1.4.3 |
Network testing |
1.4.3.1 |
Put the machine in the network and test |
1.4.3.2 |
Get signoffs |
1.4.4 |
Data restore |
Name of Risk |
Explanation |
Level of Risk |
Influence |
Process of Contingency/Mitigation |
Job Description lacking details |
Set of skills is quite vague |
Low |
Medium |
Have an expert of the industry to review it |
Allocation of resources is insufficient |
Minimum limit of resources is not achieved |
Low |
Medium |
Resources of other tasks are to be assigned here |
Disapproval of client |
Discrepancy between the point of view of client and project |
Medium |
High |
Personal meetings with clients to be arranged |
Client Requirements are improperly projected |
Discrepancy between the point of view of client and project |
Medium |
High |
Industry expert to review the problem |
Network analyst missing |
Analyst quit or on leave |
Low |
High |
Another analyst to be hired |
Documentation loss |
Failure of Hard Disk Drive |
Low |
High |
Data recovery to be done with the help of IT tools |
Increase in the license fees of design tools |
Discount season has ended |
Low |
Low |
Alternate freeware tools to be sought after |
Absence of Implementation engineer |
Engineer quit or on leave |
Low |
High |
-Another engineer to be hired -Implementation engineer to be hired on a contract -Other resources to be reassigned |
Absence of Network Engineer |
Engineer quit or on leave |
Low |
High |
-Another engineer to be hired -Implementation engineer to be hired on a contract -Other resources to be reassigned |
Standard configuration of network is lacking |
Proper documentation is lacking |
Low |
Low |
Industry expert to review the problem |
Software cost is increased |
License fees are increased |
High |
Low |
Alternate freeware tools to be sought after |
User disapproval |
User acceptance testing faces hiccups |
High |
High |
Personal meetings with clients to be arranged |
User reviews are facing delays |
Reviews are not presented on schedule |
Low |
High |
Notifications are to be sent |
A set of measurable values which are associated with quality of the product is typically referred to as product’s quality metrics. Similarly, a software’s or a system’s quality metrics could be used to determine the extent to which the system or the software meets the requirements of the business. The usage of quality metrics raises objectivity of evaluation of the product quality. The human evalution of quality is subjective therefore it’s a possible source of disagreement between the system provider and the users. Thus the measurement of these qualities should not be only prepared at the end of project but more importantly during the project’s execution.
Typically, a system’s metrics are measured in the following terms:
The time-phased budgeting is the core of the cost estimation. The time-phased budgeting technique does the job of integrating the schedule of the project and also, the budget of the project. This method acts as the stepping-stone towards making the budgetary. There is no relation between budget and schedule of a project until the two are merged together. Once time-phased budgeting is done, the manager of the project gains the added capacity to further point out the time at which the occurrences of certain expenditures take place. The outflow of cash is more accurately depicted which can result in the appropriate planning being undertaken.
Activity |
Estimate Date |
Cash Inflow |
Cash Outflow |
Balance |
Preparation of project plan |
Thu 2/5/15 |
35000 |
2160 |
32840 |
Hardware sizing |
Tue 2/17/15 |
4560 |
28280 |
|
Vendor selection |
Thu 2/19/15 |
6100 |
22180 |
|
Backup |
Fri 2/6/15 |
600 |
21580 |
|
Raise invoice |
Thu 2/19/15 |
7400 |
14180 |
|
Installation |
Mon 8/25/14 |
2440 |
11740 |
|
Machine test |
Thu 9/25/14 |
3960 |
7780 |
|
Network testing |
Fri 10/3/14 |
920 |
6860 |
Conclusion
The principles of PMBoK have been respected while the upgrading of the company’s IT infrastructure is being done and on the basis of this, the manager of the project is able to determine the requirements and exclusions that are needed to be done in the project. At the time of the up gradation, this might affect the functionality of the other departments and thus time, resources and budget are of critical importance.
References
Gulla, J. (2012, Feb). Seven Reasons IT Projects Fail.
Organizing for Project Management. (n.d.).
Duncan, W.R. (n.d) A guide to Project Management Body of Knowledge.
Hamilton, G. (n.d.). Risk management and project management go hand in hand.
HubPages. (n.d.). Project Management Time & Cost Estimation Techniques: An Overview.
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more